The UltraDeck Range
-
LASTS 3X LONGER than traditional decking oils
-
Guaranteed to never peel, flake or blister
-
Formulated to last in Australia's harshest conditions
-
Low VOC (Volatile organic compounds)
-
Made in Australia
How to prepare and coat timber for 3x longer protection


Universal Timber Oil
Universal Timber Oil is the clear choice when you’re after the ‘uncoated’ look. The clear decking oil deeply penetrates into the timber to provide lasting protection, leaving your timber with a matt sheen that enhances its natural beauty.
With a 24h re-coat time, Universal Timber Oil is specially formulated to be coated over existing mineral oil coatings.
It creates an unlocked system, meaning the timber can be recoated with any water or oil-based coating in the future.
Project Planner


Intergrain is here to help.
In just 8 simple steps, their Project Planner will put together a tailored project plan to help you tackle your job.
Project Advice


Intergrain are passionate about timber. From everything you need to know about preparation and coating to an encyclopedia on timber, Intergrain’s wealth of knowledge is at your fingertips.
Get the job done right with Intergrain.
Learn more about Intergrain
How to prepare and coat timber for 3x longer protection
Intergrain Universal Oil
Applying Intergrain UltraDeck Timber Oil
Preparing a new timber deck with Intergrain UltraPrep
Intergrain - Done Right - Not all decking oils are equal
Intergrain Universal Oil - Deeply Penetrating Oil
Get the job done right
Intergrain’s Commitment To Sustainability
Timber is the most sustainable building material and Intergrain’s range of extensive, high-performance products are specially designed to preserve this beautiful resource. Intergrain is committed towards a more sustainable future by continually improving its product range and reducing waste.
Trade & Industrial


Combining coatings expertise, comprehensive product ranges and access to coating equipment and machinery, Intergrain can meet your unique business needs and get the job done right.
Intergrain manufactures and supplies some of Australia’s market-leading woodcare brands, imports specialist coatings and equipment from Europe, and produces bulk product solutions for industrial applications.


















